Transformer Sales and Installation

 
Our Experienced Team has installed thousands of Transformers and Kept them In Service, Delivering The Reliable Power You Need.

We can start with receiving inspection at the rail siding, port of entry, substation site or wherever the unit is located, and then assemble all parts that were removed for shipment to make the transformer operational. If the unit was shipped oil-filled and it is necessary to lower the oil level to install bushings or other parts, Jiko Service can get it done.

Transformer Installation Service oil tank trucks can be summoned to the site for oil storage or hauling, and we can bring in one of our many oil-processing rigs. Using your specifications, the transformer supplier’s specifications or ours, Jiko Service can vacuum, degasify and prepare new oil for installation, pull vacuum on the transformer and professionally complete the vacuum oil-filling process.

A wide range of tests can also be performed to verify that your transformer is ready for service including: Core Resistance (Megger), TTR (Transformer Turns Ratio), Winding Insulation Resistance, Winding Excitation, Winding Resistance, CT (Current Transformer) Ratio, Polarity and Saturation, Operational Check of Controls, Calibration of Gauges, Thermal Scans, Materials & Oil Testing, Degree of Polymerization, Particle Count, Metals-in-Oil Analysis, etc.

Your transformer is one of the most expensive and important components in your substation, and you can be confident that the skilled Jiko technical personnel team will assemble and install it right.

We specialized in thee following electrical installations;
1) Power Transformer Installation
2) Industrial Generator
3) Rural Electrification
4) House wireing
5) Installation of Inverters