LOS Survey and Design

 

Jiko’s Survey
Jiko dedicated to provide theoretical as well as practical (field study) details in GSM link design from core to end. Jiko engineers are well experienced line of sight and other measurements. We execute LOS survey and calculates link budgets with the help of latest microwave planning tool. The ultimate goal of a site survey by Jiko Energy Services Ltd is to acquire ample information to determine the number and placement of access points that allows optimal coverage throughout an organisational facility.

Jiko Line of Site (LOS) survey is carried out in the following steps:

Collect Nominals of proposed site and those of the nearest locations to which customer proposes the LOS connectivity & Verification, Record latitude, longitude, building data, obstruction data and surrounding terrain data on the LOS Survey template, Generate LOS Path Profile for the proposed Link, Conduct physical survey of the hop to identify any field obstructions and verify the LOS path profile.

Network Audit
Networks require consistent maintenance and vigilance to ensure reliable service delivery and adherence to end user Service Level Agreements (SLAs).

Objectives of Jiko’s Network Audit services include; Network characterization and assessment,Comparison of measured data with data on similar systems, Recommendation of possible course of action and Network modifications, Compilation of Network data for Network expansion, operations and maintenance Depending on the type of Network. Jiko’s Network Audit services offer
Terminal Equipment Interface Analysis, Voice Quality Measurement, Network Configuration Comparison, Trouble Ticket Analysis, Aster’s systems professionals audit, experiment and test the Networks in an effervescent environment, construct empirical Network models from the collected statistical data, locate root causes and recommend possible course of action and Network modification if required.

A detailed report of the findings of the audits and analysis of the data is compiled and presented to customer’s engineering team for initiating necessary corrective actions and proactive measures for future expansions.